1) Regeneration fuel: a mixture of hydrogen and inert fuel (hydrogen accounts for five% -ten%)













two) Amount: 40L gasoline cylinder 10Mpa













three) Regenerative gas pressure: .05Mpa (the gasoline consumption for each 50 percent hour in the point out of .05Mpa is that the cylinder stress drops by 1.5Mpa. If it exceeds one.5Mpa, the strain of the pressure regulator’s program will be minimized, if it is much less than 1.5Mpa Maximize the pressure of the strain regulator program)













4) Method: 3 hrs heating-3 hours heating and ventilation-three several hours vacuuming-1 hour pumping-ten hrs cooling













5) Methods:













① Hook up the regeneration gasoline (test the pipeline for leaks right after relationship: after connecting, open up the major vac glovebox valve of the tension cutting down valve to the highest, open up the auxiliary meter to .1Mpa, switch off the main valve, wait 15 minutes, if the pressure of the auxiliary meter continues to be at .one Mpa stays unchanged, indicating no air leakage)













②Set the force of the auxiliary gauge of the force decreasing valve to .1Mpa (the tension for the duration of air flow is about .06-.08MPa)













③ Shut the cycle and analyzer













④Turn on the vacuum pump













⑤ Begin regeneration













⑥ The new program ends at 20h (clear prior to cleansing, drinking water and oxygen index <200ppm).













6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 hours!













7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.